Airbus Defence and Space

Flight 195 Ariane 5 – Satellites: ARABSAT-5A – COMS

Flight 195 is the 51st Ariane 5 launch and the second in 2010. An ARIANE 5 ECA (Cryogenic Evolution type A), the most powerful version in the ARIANE 5 range, will be used for this flight.

Flight 195 is a commercial mission for Ariane 5. Launcher 552, the 47th production phase ARIANE 5, is the twenty-fifth of the 30 PA contract launchers, for which AIRBUS DEFENCE AND SPACE is production prime contractor. 552 is consequently the twenty-sixth complete launcher to be delivered to Arianespace, integrated and checked out under AIRBUS DEFENCE AND SPACE responsibility in the Launcher Integration Building (BIL).

In a dual-payload configuration using the SYLDA 5 “A” (6.4m high) system and a long pattern fairing (total height: 17m), the launcher is carrying the satellites ARABSAT-5A in the upper position and COMS in the lower position.


Launch Kit_Flight 195.pdf

Arabsat-5Ariane 5COMS